{"id":1270,"date":"2022-05-21T00:12:31","date_gmt":"2022-05-21T05:12:31","guid":{"rendered":"https:\/\/turfgolfstrategies.com\/?p=1270"},"modified":"2022-06-02T11:23:50","modified_gmt":"2022-06-02T16:23:50","slug":"diseno-y-construccion-green-hoyo-14-2","status":"publish","type":"post","link":"https:\/\/turfgolfstrategies.com\/en\/design-and-construction-of-green-hole-14\/","title":{"rendered":"Design and construction of green hole 14"},"content":{"rendered":"

Location:<\/strong> El Rancho Club
Year:<\/strong> 2022
Category:<\/strong> Maintenance and lakes.
Work performed:<\/strong> Design and construction of green hole 14.
Description of work performed:<\/strong> Utilization of beneficial bacteria, algae mediation, fingerling release for biological control of weeds and algae to enhance the efficiency of lake treatment.<\/p>\n\n\n\n